Document review
Approved drawings, QAP requirements, process documents and inspection stages are aligned before production.
Discuss a project 
Quality & assurance
It is a controlled chain from engineering review and material receipt to fabrication, dispatch and installation.
ISO 9001 quality system
Rawatsons operates an ISO 9001 quality management system. Certificate details and scope should always be read from the current valid certificate supplied with project documentation.
Approved drawings, QAP requirements, process documents and inspection stages are aligned before production.
Materials, welding, drilling, dimensional checks and protective finishes are controlled through the production sequence.
Inspection hold points and test records are maintained for client, railway and third-party review.
Identification, packing and sequence are planned to support safe installation and programme commitments.
Start a conversation